1 Scope

The draft sets requirements and recommendations for help content in mobile apps, from first planning through to testing, and it leaves the device hardware itself out of scope.

What this clause covers

Clause 1 is short and it decides every later argument about scope. It puts the draft in the middle of the product process rather than at the end of it: the help is designed, developed and evaluated, not bolted on after release. It names two routes into mobile help. One is content written for the mobile setting. The other is content that already exists for print, desktop or the web and is transformed by responsive design. The draft keeps the interface hardware out of its own remit. That exclusion is precise: a team still has to make the help readable on the screen it has, but the draft does not specify the screen, the speaker or the sensor.

What to put in place before publication

  1. Write a one page scope statement for your user assistance that names the apps, the platforms and the languages covered.
  2. List the help forms in play, such as embedded help, coach marks, a help site, a chatbot and video, and mark which are in scope this year.
  3. Record which existing content will be transformed by responsive design and which will be written fresh for mobile.
  4. State the exclusions plainly, including hardware specifications and any content owned by another team.
  5. Name the person who owns the scope statement and the date it was last checked against the app roadmap.

Evidence to keep

EvidenceWhat it looks like
ScopeA signed scope statement naming apps, platforms, help forms and languages
RouteA list that separates content written for mobile from content transformed by responsive design
ExclusionsA note that names the device hardware and any out of scope content
OwnershipThe named owner and the review date in the help plan

The test a reviewer runs

  • Does the plan say which apps and which help forms the work covers?
  • Is there a written decision on responsive transformation, or is every piece of help assumed to be new?
  • Can the team name what it is not doing, including the hardware side?
  • Would a new product manager understand the boundary from the plan alone?

Where teams usually fall short

  • The scope is a sentence in a project ticket, not a document the team can test against.
  • Responsive transformation is treated as a copy and paste job with no owner.
  • The help is planned for the app store release, after the content freeze.

What happens next

When the FDIS text appears, check whether the scope sentence changed and whether the exclusion of hardware specifications still stands. Re-read the clause before the first release that follows publication.

Source

ISO Online Browsing Platform, free preview of ISO/IEC/IEEE DIS 26517 https://www.iso.org/obp/ui#iso:std:iso-iec-ieee:26517:dis:ed-1:v1:en read 21 October 2026

ISO/IEC/IEEE DIS 26517, standard record 87297 https://www.iso.org/standard/87297.html read 21 October 2026

The rules this is built from

Read from the real rules, not invented.

This page is read from the public record for clause 1: the heading in the free contents, and where public, the text the preview carries.

  • 80 headings and defined terms
  • 12 dated stages behind the draft
  • 26514:2022 named as the normative reference